Upkeep control proposition.
Specs with a capability to melt 100kgs/Hr.
Best quality air-cooled stainless steel. The chimney/stack must have a.
▪ Connect heaters to fuel supply.
To bum medical waste in a clean in addition to environmentally effective
cargo”.
accreditation.
The total construction and constructing period. The delivery.
5 Ability to support tools.
the specialist.
2.11 Afterburner.
6 Appointing as well as Training.
Paperwork in order to help with the lawful needs for the
▪ Customer support: The Bidder is called for to guarantee that a.
To make it possible for free-flow of diesel from the storage tank to the incinerator.
Medical centre and also the Getting Authority. The therapy plant must.
Waste Tracking Guideline 2006, lawful notice No. 121 of
▪ The maintenance agreement price includes work, transportation and also.
A cover;
The plant transferred by sea shall not be delivered as “deck.
Republic of Kenya. The Bidder will supply a time .
iii.
Make accessible all needed technological advice, drawing, etc to.
iv.
Calcium silicate insulation and also a hot face mixture of very.
▪ The incinerator shall be operated on a three-phase power supply
Supply an one-year substitute solution components (e.g. oil filters, air.
importation. The Prospective buyer shall offer each of the essential
Setup works.
I. Waste type medical care waste.
Take place at the last destination.
Procedure manual 2 sets.
Operators after installation & & commissioning of the devices.
▪ The container should be attached to the incinerator at higher level.
Reduced section of chamber walls.
▪ Calcium silicate.
▪ The smokeshaft will be painted with accepted warmth immune.
· Optimum evaluation: a minimum of 450kW/hour.
▪ Thermal conductivity 1.3 W/mk.
▪ Restricting constant solution restriction 1500 ° C. ▪ Thickness 100mm.
Any sort of roof adjacent to the incinerator.
▪ 1 off diesel-fired ignition burner– temperature controlled.
ͦ Verifying this accredited care, service as well as.
Burning chamber for removal of particle pollutants.
▪ 3 stage 415 V a.c., 50/60 Hz.
▪ Provide lifting gears as forklift, gantry, rollers, and lifting.
Additional components and consumables recommended by the Supplier.
The linking pipe has to be a black pipe of accepted estimate.
Subsequent connected specs
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]