Ensure flame contact with all gases is achieved. –yes
Ensure residence time is not less than two (2) seconds. –yes
Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame
zone, is less than 1100oC. –1000-1200 oC
Ensure the oxygen content of the emitted gases is not less than 11%.–yes
Ensure both primary and the combustion temperatures are maintained until all waste has been completely
combusted–yes
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]
5 Particulate Removers A mechanical particulate collector has to be integrated after secondary combustion
chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may comprise
some of the following or a combination thereof:
Cyclone separator
Electrostatic precipitators
Fabric filters— filter brick
6 Chimney / Stack 1. The topography and height of adjacent buildings
within 50 meters radius should be taken into consideration. –6 meter already, can plus 4 meters, free cost
unacceptable.
If possible the chimney should be visible to the operator from the feeding area.—according to local site
The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
wind speed x 2) whichever is higher to ensure no down washing of leaving gases. . –yes
The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity =
Point for the measurement of emissions shall be provided. .–yes
7 Instrumentation Instrument for determining the inside wall temperature and not burner flame temperature has to be
provided for both primary and secondary chambers. –yes
below the required temperature.
An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to
Capacity Not less than 500Kg/hr.
Operation 24hr-7days/week continuous operation.
Combustion chamber 2 combustion chamber.
Temp. First combustion chamber 800-1000 C.
Secandry combustion chamber 1000-1200 C, with the possibility to be updated to 1400
Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400