| |
|
|
|
|
|
| TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP |
| |
|
|
|
|
|
| ITEM |
DESCRIPTION |
UNIT |
QTY |
RATE |
KSHS. |
| |
|
|
|
|
|
| |
Incinerator |
|
|
|
|
| |
To supply and install the following |
|
2NO. |
|
|
| |
Hospital Incinerators to Nema standards |
|
|
|
|
| |
The following are the incinerator specifications :- |
|
|
|
|
| A |
Ø Waste type: Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste |
|
|
|
|
| |
Ø Waste density: 125 to 350Kg/M³ |
|
|
|
|
| |
Ø Waste CV: 4000 KCAL/Kg |
|
|
|
|
| |
Ø Moisture content: 10-25% |
|
|
|
|
| |
Ø Estimated ash residue: 5-10% |
|
|
|
|
| |
Ø Nominal capacity: 100Kg/hour batch load |
|
|
|
|
| |
Ø Secondary chamber: 2 second @ 1100ºC |
|
|
|
|
| |
Ø Environmental: NEMA ACT (EMCA) 1999 |
|
|
|
|
| |
Clean Air Act 1999 |
|
|
|
|
| |
BS3316 1987 |
|
|
|
|
| |
Equipment |
Set |
|
|
|
| |
The Incinerator must comprise of: – |
|
|
|
|
| |
Ø Manual Loading door (heavy duty steel door with appropriate refractory lining) |
|
|
|
|
| |
Ø Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long |
|
|
|
|
| |
Ø Full sized bulk load/ash removal door |
|
|
|
|
| |
Ø 1 off diesel-fired ignition burner – temperature controlled |
|
|
|
|
| |
Ø 1 off combustion air supply fan and distribution system, automatic control |
|
|
|
|
| |
Ø High capacity secondary combustion chamber 2 second @ 1100ºC with |
|
|
|
|
| |
Ø 1 off diesel-fired afterburner – temperature controlled |
|
|
|
|
| |
Ø Control Panel – automatic operation |
|
|
|
|
| |
Ø Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation) |
|
|
|
|
| |
Ø Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator |
|
|
|
|
| |
Carried Forward To Collection Page. |
|
|
|
|
| |
NOTE: WE REQUIRE TWO INCINERATORS. ONE |
|
|
|
|
| ITEM |
DESCRIPTION |
UNIT |
QTY |
RATE |
KSHS. |
| B |
Diesel Tank: |
|
|
|
|
| |
To provide for diesel service tank (Capacity 400 litres) including level indicator
The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.
|
Item |
1 |
|
|
| C |
Installation & commissioning works |
|
|
|
|
| D |
Positioning of Incinerator: –
EVALUATION STANDARD
|
Item |
1 |
|
|
| E |
Connect burners to fuel supply. |
No. |
2 |
|
|
| F |
Chimney Installation: |
|
|
|
|
| G |
Composition of the chimney: –
Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.
100
Pass mark for technical analysis is 70/100 marks
|
Item. |
1 |
|
|
| H |
Commissioning & Training: |
|
|
|
|
| |
Testing set operating parameters, training of operators and technical staff. |
Item |
1 |
|
|
| I |
Commissioning Maintenance Contract |
|
|
|
|
| |
Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal). The maintenance contract price includes labour, transport and accommodation for the attending technicians. |
Item |
3 |
|
|